Sir John By Bertone
6720 Rue Sherbrooke Est Montreal, QC
To Be Determined
About Sir John
113 units
1 Bedrooms, 2 Bedrooms, 3 Bedrooms
construction
See life in new.
A brand new living space in the heart of a fully developed neighborhood, an accessible dream signed by Sir John.
Condos Sir John: Buy with only a 5% deposit*
Espace Langelier: Reserve your rental unit today
Summer-Fall 2022 occupancy
*Limited time offer.
Source: Sir John Condos
Sir John is a new development by Bertone currently under construction at . Sir John has a total of 113 units. Sir Johnhas price range from Price Coming soon. Sizes range from to square feet.
Sir John Details
Website:
N/A
Builder:
Bertone
Neighborhood:
Longue-Pointe
Building Type:
N/A
Construction Status:
construction
Selling Status:
N/A
Completion:
Amenities
Pricing & Deposit Structure
Pricing
Deposit Structure will be available soon
Features & Finishes
The concept
All 113 units offer an impressive ergonomic concept that suits the needs of first-time buyers, retirees, and families requiring more space.
- Open concept kitchen area
- Abundant windows
- Roof terrace
- Engineered wood flooring
- Modern bathroom
Live at the heart of contemporary design.
Moving into the Sir John means choosing a turnkey unit with a neat design. A living space where every square foot is optimized by renowned architects. A trendy decor worthy of magazines where all you have to do is sit down to enjoy incomparable comfort.
PENTHOUSE
SPACIOUS RESIDENCES BATHED IN LIGHT
Its area of up to 1123p2 extends over the last 2 floors. On the upper level, the kitchen area, the dining room and the living room harmoniously compose an aerial architecture opening onto a gigantic roof terrace. Between the two, full-height windows ensure a bright interior and an impressive exterior view.
Floor Plans & Pricing
Floor plans for Sir John are coming soon
Got a query about Sir John, Montreal?
Ask your query about the project and our community will help you with your query.
Nearby projects
Vertica, Montréal QC
Vertica
Quartier Général - Phase 2
OSHA